Skip to content
Cogio

Automating quotes in an SME: from the request for a price to the quote sent

How to automate your quotes: the steps an AI agent takes on, what you need in place, and a price that is always approved by a person.

, co-founder of Cogio

Two people reviewing a floor plan and a document on a table
Photo: Kampus Production, Pexels

What automating a quote actually means

A quote brings two kinds of work together. The first is judgment: should you respond to this request, at what price, with what lead time? The second is preparation: reading the request, gathering the drawings, finding a similar job, copying prices, formatting the document, writing the email, then remembering to follow up.

Automating a quote means handing the preparation to an AI agent that works inside your tools, while the judgment stays with your team. The agent starts when a request for a price arrives. It works through the steps, leaves a draft quote and stops. A person reviews it, adjusts it, approves the price and sends it.

What it does not mean: a price calculated and sent by a machine. The agent does not know what your estimator knows about the customer, the job and how busy the shop is. It does not mean switching estimating software either. The agent fills in your template with your prices.

An ERP whose agents carry out administrative work this way, under people’s approval, is called an agentic ERP. The quote is a textbook example.

The steps of a quote and what the agent takes on

The table follows a quote from the incoming email to the customer’s answer. For each step, it shows what changes and who keeps the decision.

Only one step is never delegated: approving the price. Everything else is preparation work that the agent does for you, then puts in front of you.

A quote, step by step
Receiving the requestEmail read between two calls, attachments to fileRequest read as soon as it arrives, attachments filed, job opened under its numberThe project manager decides whether to quote
Building the fileDrawings, specifications and old jobs searched for on the networkDocuments gathered, comparable quotes found, missing items flaggedNo approval needed
PricingQuantities and prices copied into a spreadsheetDraft prepared from your price lists and your costing rulesThe estimator adjusts and validates every amount
CheckingProofread by the person who built the quoteSecond pass by an agent that compares the quote with the request and lists the points to checkThe estimator settles each point
SendingLayout, PDF and email done by handQuote formatted in your template, email left as a draftA person approves the price and sends it
Follow-upFollow-up done from memoryFollow-up written ahead of time, at the interval you setThe project manager reviews and sends it

A request for a price, from email to draft

Take a machine shop in Drummondville. On a Tuesday at 7:40 a.m., a customer emails a request for a price on forty welded brackets, with two drawings attached. The office is still empty.

A first agent reads the email, recognizes a request for a price, opens a job under its number and files the drawings there. A second one finds the comparable quotes already done for this customer in the shared folders. A third prepares the draft: material, subcontracting and labour, calculated from the shop’s price lists. A last one reviews the whole thing against the request. It lists the points to check, such as a part shown on the drawing but missing from the pricing.

When the estimator arrives, a finished quote is waiting, with its points to check and a reply email in draft. They correct a welding time, validate the price and send it. The preparation happened without them. The decision is entirely theirs.

This division of roles is the one running at Les Industries Romy, where specialized agents share the mail, the job files, the quote and the review. For calls for tenders and construction drawings, our article on construction bids goes further.

Animated demo. A quote request handled end to end, from the incoming email to follow-ups until the quote is accepted.

What you need in place

An agent does not guess your prices. It applies yours. Four things make the difference between a useful draft and one you have to redo.

If one of them is missing, the project starts there. Our data self-assessment helps you measure the gap. And if your prices live in several spreadsheets, our free ERP, with no licence to pay, brings them together in one place.

  • Past quotes you can find. Ideally with their outcome: won, lost or left unanswered. That is the memory the agent uses to find a similar job.
  • Up-to-date prices, in one place. Material, subcontracting, hourly rates. An ERP, accounting software or a well-kept spreadsheet will do, as long as one person is responsible for it.
  • A stable template. Same sections, same terms, same layout. The agent fills it in and your customer recognizes your documents.
  • Written rules. Who approves what, from what amount, after how many days you follow up. These rules set how far the agent goes on its own.

Following up on quotes with no answer

A quote that has been sent is only half done. Follow-up takes memory. That is exactly what runs short when the shop is overloaded.

The agent keeps the list of quotes by due date: those whose submission deadline is coming up, then those waiting for the customer’s answer. At the interval you set, seven days after sending for example, it writes a follow-up suited to the customer and the job, then leaves it as a draft. The project manager reviews it and sends it in one click. When the customer accepts, the project manager confirms the order and the job moves on to the next step.

At Les Industries Romy, the initial assessment found 16 quotes that had been sitting for more than 90 days, some of them for 900. Today, follow-ups trigger on their own and are written ahead of time.

An accepted quote opens the rest of the job: the order, the work, then the invoice. Our guide to automating invoicing takes over at that step.

The case of a Granby manufacturer

Les Industries Romy fabricates and installs structural steel in Granby. When the American tariffs slowed its growth, the company wanted to quote on more projects. Its three project managers did not have the time to do it.

Since May 2026, agents have been preparing quotes, estimates and follow-ups on the company’s own server. The result, in the words of the owner, Robin Langlois: “we now send roughly two to three times as many quotes.” Management also reports sales up 70% since the system went live, compared with the same period last year. By its estimate, the three project managers together get back 109.2 hours a week on their administrative tasks, quote preparation and follow-ups included.

These figures are management’s own observation. They have not yet been measured over a full year, and every gain is measured at the client’s site, before and after. Robin Langlois, owner of Les Industries Romy, is also a co-founder of Cogio. The details are in the Romy case study.

The rule that frames it all fits on one line: a price, a lead time, a commitment to a customer, always a human. At Romy, that rule is built into the system. An email to a customer is left as a draft and a price waits for approval.

The habits that make the gain last

These are the habits we put in place from the first day of a project.

  • Start with a single type of quote. The most frequent or the most repetitive product. You widen the scope once trust is established.
  • Keep the price in a person’s hands. That limit is what lets you hand the rest to the agent without watching it every minute.
  • Name someone responsible for prices. One list, one person who keeps it up to date. The agent’s draft is only as good as the prices it applies.
  • Record the outcome of every quote. Won, lost, no answer. Month after month, that history becomes your best pricing tool.
  • Have every quantity taken from a drawing checked. A language model can misread a dimension. So the agent cites the source of every quantity, which makes checking fast.

How to measure the gain

The gain is measured at your site, before and after. Before going live, you record the starting figures for about two weeks. The full method, recovered hours included, is in our article on the ROI of an AI assistant.

For quotes, four indicators are enough.

  • Response time. The time between the arrival of the request for a price and the sending of the quote.
  • The number of quotes sent. Per week or per month, with the same staff.
  • The follow-up rate. The share of unanswered quotes that were followed up within the set interval.
  • The win rate. To be tracked over several months, because a contract is rarely decided in a week.

Where to start

Choose the type of quote you produce most often. Gather a few recent jobs with their outcome, then check where your prices live. With these in hand, a diagnostic sets out what an agent can take on, in what order and at what cost. Our article on the cost and timeline of an AI project gives the orders of magnitude.

Manufacturers will find examples on our manufacturing page. Contractors and subcontractors have their own, construction. If you do not have an ERP yet, ours is free, with no licence to pay. The public programs that can fund part of the project are presented on the Funding page.

To talk about your quotes, write to us.

Frequently asked questions

Can you automate a quote without losing control of the price?

Yes. The agent prepares the draft from your prices and your rules, then stops. The price, the lead time and the sending to the customer are approved by a person. At Les Industries Romy, that rule is built into the system: a price waits for approval and an email to a customer is left as a draft.

What software do you need to automate quotes?

The software you already have. The agent works in your email, your shared folders, your quote template and your price source, whether that is an ERP, accounting software such as QuickBooks, Sage 50 or Acomba, or a well-kept Excel spreadsheet. If you do not have an ERP, Cogio offers one with no licence to pay.

How long does it take to set up a quoting agent?

The diagnostic takes two to three weeks. Implementation then runs from a few weeks to a few months, depending on the scope of the project and the state of your data. Starting with a single type of quote is the shortest path.

Does it work for custom projects?

Yes. Les Industries Romy fabricates custom structural steel. The agent finds comparable jobs, applies current prices and flags anything out of the ordinary. The more unusual the project, the more the estimator’s review matters. The price is always theirs to set.

How much does quote automation cost, and is there funding?

The cost depends on the number of workflows to automate, the state of your data and the software to connect. A diagnostic puts a figure on it before any commitment. Public programs such as ESSOR and MFOR can fund part of the project depending on your industry and size. Current rates are on the Funding page at cogio.ai.

Sources and references

This article is a plain-language summary, accurate as of the date shown. It is not legal, tax or financial advice: for your own situation, consult a qualified professional.